Govur University Logo
--> --> --> -->
...

Explain the specific procedures for safely removing asbestos-containing materials (if present) during tower dismantling.



The safe removal of asbestos-containing materials (ACM) during tower dismantling requires strict adherence to regulatory procedures to protect workers and the environment from asbestos exposure. The first step is a thorough inspection of the tower by a certified asbestos inspector to identify and sample any suspect materials. If asbestos is confirmed, a qualified asbestos abatement contractor must be hired to perform the removal. ....

Log in to view the answer



Community Answers

Sign in to open profiles and full community answers.

Emmanuel Niku

β€œAsbestos exposure is dangerous to the environment and humans. Therefore qualified contractors with approved tools and PPEs are reqired to remove the asbestor. The removal of the asbestos containing materials (ACM) during tower dismantling requires strict adherenace to the regulatory procedures to protect staff and the environment. The Asbtestos must be wetted down to minimize fibre release to the environment and the rea must be condoned-off . With the contractors all well briefed, work permit issued and signed, correct PPEs on, the removal can commence.The removed asbestos should be put in awell labelled containers and disposed at an asbestos disposal site. After removal the area needs to be thoroughly cleaned uisng high efficiency particulate air vacuums(HEPA). The air in area should be monitored to ensure asbestos fibre levels are below regulatory limits before the containment is removed. All the abpove needs to be documented and the disposal records maintained for reference.”

100.0%

Redundant Elements